Public rules. Explicit adoption.

Project preparation; no public network launched.

Simplicity, transparency, permanence

1 T29 per block, with no preallocation and no end date. This rule will not be changed.

This project commitment, stated in the 15 October governance document, is not a power to constrain all future software. Confirmations reduce reorganisation risk without absolute finality.

Who decides?

Maintainers propose and document releases. Each operator chooses the software they install. Nodes validate blocks under their rules; mining power does not make a rule-breaking block valid.

The publication key authenticates a release; it does not allow forced updates, taking funds or stopping consensus. The project and described trials still have one operator.

Validity, relay and signaling

The reference candidate permits zero consensus fees. An operator may set a local relay floor: refusing to relay a transaction does not invalidate a block containing it. The 24 miner signaling bits are informational; they do not automatically change consensus.

Changes must be explicit

Rule changes require compatibility analysis, a specification, tests, review and an adoption procedure. An emergency creates no founder emergency power. Disagreement can split networks and must be disclosed.

The initial document dates from 15 October and describes v8. This V2’s technical reference is the private 18 October candidate used by A30, identified in the status JSON. No public release is declared approved.
Read the complete historical document